Spring workday 2025 was a huge success. From the water to the Pavilion and all points in between, volunteers put forth a huge effort to spruce up the club. Fence line trees were pruned, water barrels were added, gravel was spread, the beach front was cleaned, the One Design Center fence was sealed, trees were pruned and grass was trimmed in the ODC, the Pavilion walkway treads were replaced, leaves and gum balls were raked, errant logs on the beachfront were chainsawed/removed, and other projects were completed. Afterward, Rhonda Edwards and her team staged a wonderful lunch for all the volunteers. This was CYC at it’s best. Christi Burford caught it all in pictures. They are posted here.